Miragoane access
Flooded bridge in Miragoane.
The freight is off loaded in little row boats transferring it to the other bank of the river to load other trucks and carrying on the transport.
By-pass in Miragoane.
To avoid the flooded bridge, a by-pass is under construction but closed from 5am to 5pm.
Some 4X4 light vehicles in very good conditions can pass by.

Download.